I'm the office administrator for a 120-person company with two locations. I handle facilities purchasing—roughly $140,000 a year across nine vendors—and I report to both operations and finance. Over the past five years I've bought space heaters, ordered custom radiator covers, scheduled water heater service, and signed off on more commercial refrigeration equipment than I ever expected to.

This is the checklist I run before I approve any heating, cooling, or refrigeration order. Eight steps, in the order I actually use them. Nothing here requires an engineering degree, but skipping a step has cost me real money—more on that in Step 6.

When This Checklist Applies

Use it when you're dealing with any of the following: supplemental office heating (space heaters), decorative or safety covers for radiators, routine hot water heater maintenance, or commercial refrigeration—including a Bitzer compressor, a Bitzer condensing unit, or replacement parts for an existing system.

It works whether you're buying one unit or refreshing a whole mechanical room. What it won't do is replace a proper load calculation from a licensed contractor. I can't stress that enough.

The Checklist

Step 1 — Diagnose the complaint before you buy anything

When someone says "it's cold over here," the answer isn't automatically a space heater. The first time I got that complaint, I ordered three units for a north-facing row of desks. Two weeks later, facilities found a blocked return vent. We didn't need the heaters at all.

Ask three questions: Is the building system actually running? Is the furniture blocking airflow? Is the complaint about temperature or about draft? Fix the cheap thing first.

Step 2 — Size the unit to the room and the circuit

Space heaters are supplemental by design. Per ENERGY STAR guidance, they're not meant to replace a building's primary heating system, and treating them that way is how you end up with tripped breakers and higher bills.

Check two numbers before ordering: the square footage of the space and the wattage of the unit. A 1,500-watt space heater pulls about 12.5 amps—on a shared 15-amp circuit, that's a problem waiting for the first cold Monday. Ask your facilities team which circuits are dedicated.

Step 3 — Look behind the radiator cover

Radiator covers are usually cosmetic. Sometimes they're a safety requirement. Either way, they affect heat output, and most buyers never ask about it.

Check the louver spacing and the clearance between the radiator fins and the cover. A tightly slatted cover looks clean in a showroom and strangles airflow in an office. If you're ordering custom covers for a client-facing space—a reception area, a conference room—ask for the airflow spec, not just the finish samples.

Here's the thing: visitors notice this stuff. When we replaced the battered covers in our main conference room, two separate clients commented on how much more put-together the space felt. The covers cost about $180 each. Cheap, relative to what a first impression is worth.

Step 4 — Put "drain the hot water heater" on a recurring calendar

This is the step almost everyone skips. If you don't know how to drain a hot water heater, learn it or hire it—but don't ignore it.

The U.S. Department of Energy recommends draining a tank-style water heater roughly once a year to remove sediment. Sediment insulates the burner from the water, so the tank works harder for the same output. Our first building's heater was six years old before anyone drained it. The plumber's comment was something along the lines of "well, that explains the recovery time."

The basic procedure: shut off the power or gas, close the cold-water inlet, connect a hose to the drain valve, and let it run until the water clears. If you've never done it, pay a plumber the first time and watch. Then schedule it annually in whatever system you actually use—not a note in someone's desk drawer.

Step 5 — Match the compressor to the load, not the price sheet

This is where cheap decisions get expensive. A Bitzer compressor or Bitzer condensing unit needs to be sized against the actual cooling load—ambient temperature, product turnover, door openings, duty cycle. The price sheet won't tell you any of that.

I went back and forth for two weeks between rebuilding our aging compressor and replacing it with a new Bitzer condensing unit. The rebuild was about 40% cheaper upfront. We chose the new unit because the old one had already been rebuilt twice and the downtime was starting to affect operations. Even after signing off, I second-guessed it. What if the new unit didn't perform the way the spec sheet promised? The three weeks until commissioning were tense. It ran exactly as specified, but I didn't relax until the first month of temperature logs came back clean.

One more thing on parts: compressor Bitzer replacement components need to match the model and serial number. Don't assume a generic part fits. Ask the vendor for the compatibility documentation in writing before you order—that's not a knock on any brand, it's just how industrial refrigeration works.

Step 6 — Verify the vendor can invoice correctly before the first order

My $2,400 lesson. I found a vendor with a great price on radiator covers and placed the order. They delivered on time. Then they handed over a handwritten receipt. Finance rejected the expense report outright, and I ate the cost out of the department budget.

Now I verify three things before any first order: can they issue a proper invoice with our PO number, can they itemize line items, and can they provide a W-9 or tax ID on request. I ask by email so there's a record. It takes five minutes and has saved me at least two headaches since.

Step 7 — Price the whole job, not the box

The unit price is maybe 60% of what you'll actually spend. The rest: freight, rigging, installation, commissioning, first-year maintenance, and spare parts.

For refrigeration equipment especially, a condensing unit without a commissioning visit isn't a finished job. Ask for a line-item quote that separates equipment from labor. If a vendor won't break it out, that's information too.

Step 8 — Build the service calendar before delivery

Set up the 12-month schedule before the equipment arrives, not after. Ours covers: water heater drain (annual), refrigeration leak check (quarterly), radiator cover cleaning (twice a year, before heating season and after), and space heater inspection (October, before anyone plugs one in).

Sound boring? It is. That's the point.

Common Mistakes I've Made or Watched Others Make

I don't have hard data on how much our radiator covers cost or save us in energy terms—I wish I'd tracked it from the start. What I can say anecdotally is that the rooms with properly spaced covers warm up faster and generate fewer complaints. Take that for what it's worth.

And a caveat: this worked for us, but we're a two-office operation with predictable occupancy and a facilities team I can call. If you're running a warehouse, a restaurant, or anything with wildly variable loads, the calculus is different. I can only speak to what I've actually managed.

The checklist isn't glamorous. But it's the difference between buying equipment and buying problems.